Concrete Road, Airport & Square Pavement Repair

Partial Repairs of Slabs & Concrete Elements:

The repair materials we select offer properties that allow use within 30 minutes of installation. This is particularly important in sensitive areas, such as airports, motorways or heavily loaded logistics facilities.

Concrete Slab Replacement

  1. traditional replacement – may be accepted for use after at least 21 days,
  2. prefabricated components,
  3. fast-setting concrete – may be accepted for use on the same day (after about 6 hours).

Concrete Crack Repair:

  1. crack milling and sealing,
  2. anchor stitching,
  3. diagonal stitching.

Resin Coating:

  1. Coatings on concrete station pavements,
  2. Coatings after a vehicle fire,
  3. Coatings in warehouses.

    Ask for this service